PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor IT Room Facing South.jpg Erecting the stone panels at the East Elevation 1.jpg Erecting the stone panels at the East Elevation 2.jpg Erecting the stone panels at the East Elevation 3.jpg Installing sprinkler branches-head at the 3rd floor Facing West.jpg Sprinkler heads at the 3rd floor Facing North.jpg
Previous pageNext page Installing sprinkler branches-head at the 3rd floor Facing West
Installing sprinkler branches-head at the 3rd floor Facing West